Battery Station Layout for Tynemouth Project
This document presents the layout of a battery station for the Tynemouth project, prepared by Switch On Ltd. The drawing includes detailed dimensions of the station, such as overall length of 6058mm and width of 2696mm, with a concrete base thickness of 150mm. Key components are labeled with measurements, including a 13mm feature and various spacing dimensions like 300mm and 2438mm. The site is located at Unit G, Algernon Industrial Estate, New Yerk Road, Shiremoor, Shields, NE27 0NB, UK. The drawing is for planning purposes, with revisions noted: first issue on 12-02-2025 and revised on 28-03-2025. The scale is 1:20, and the drawing number is SOP 110 B. This layout is essential for the construction and approval of the battery station, ensuring proper placement and adherence to specifications.